The common response is to calculate theft by what was taken. A stolen generator: $3,000. Copper wire stripped from the building: $2,000. Fuel siphoned from equipment: $500. But the actual cost hits when the crew shows up Monday morning and can’t work because the generator is gone. The subcontractor waiting on power reschedules. A week of labor sits idle. Penalties start accumulating.
That’s how a $3,000 theft becomes a $50,000 delay. General contractors and project managers understand that math, even when the insurance adjuster doesn’t ask about it. Construction site theft prevention is a project cost control issue, not just a property crime issue.
The categories that hit NJ job sites hardest: portable tools and equipment, copper wire and plumbing materials, dimensional lumber and framing materials, fuel from heavy equipment, and small machinery left unsecured overnight. Each one represents a different vulnerability window.